Silesia Drum

Buy in

14

[04.06,15.08,01.11,11.11,25.12,26.12]

and we will send the order today.

Place your order today and we'll ship it the next business day.

Place your order today and we'll ship it the next business day.

TAMA Starclassic Walnut/Birch 10,12,14,16,22 (PBK)

Availability: Available for order
Price: 951 815,35 Ft 951815.35
incl. 23% TAX, excl. shipping costs
quantity x

product unavailable

Rating: 5
Vendor: TAMA
Product code: WBS52RZS-PBK
Pin It

Description

TAMA Starclassic Walnut/Birch – The new standard of modern drum sound

Evolution that inspired – revolution that surprises.
Following the success of the Starclassic series constructed from maple, birch, bubinga, and birch/bubinga combinations, the TAMA brand goes a step further, presenting a breakthrough sound in the Starclassic Walnut/Birch series. This is the result of intense research, testing, and a passion for creating instruments with a unique character.

The new shells combine the warmth and depth of American walnut's low and mid frequencies with the clear attack and definition of birch. The effect is a sound that is familiar, yet completely new – modern, versatile, and inspired by the needs of contemporary drummers.

Starclassic Walnut/Birch is not only exceptional sound, but also the highest build quality and a range of innovative technical solutions.

Set specification:

  • Configuration:

    • Bass drum: 22" x 16"

    • Tom: 10" x 7"

    • Tom: 12" x 8"

    • Floor Tom: 14" x 12"

    • Floor Tom: 16" x 14"

  • Shells:

    • RT/FT: 6 mm (4 plies of birch + 2 inner plies of American walnut)

    • BD: 8 mm (5 plies of birch + 2 inner plies of American walnut)


  • Drumheads: Evans

  • Hoops: Die-Cast

  • Systems and features:

    • Star-Cast Mounting System – stability and resonance without compromise

    • Quick-Lock Tom Brackets – fast assembly and disassembly

    • Swivel-Wing Tom Holder – flexible positioning

    • Air Cushioned Floor Tom Legs – maximum resonance for floor toms

    • Bass Drum Spur Bracket – solid bass drum mounting

    • Claw Hooks – classic look and reliable hoop grip

    • Hold Tight™ Washers – better tuning stability


Starclassic Walnut/Birch is the quintessence of the modern approach to drum building – an instrument that evolves with the drummer and never stops inspiring.


Product reviews (0)

All reviews (positive and negative) are displayed. We don't verify that they come from customers who have purchased the product.

Submit
up
Shop is in view mode
View full version of the site
Sklep internetowy Shoper Premium